Mid November thru Mid December Time Lapse



The second floor has been poured and the framing of the 2nd floor exterior wall is progressing. Steel for the south wing is on site.  Construction is running behind about one month so the hope is the building will be totally enclosed by the end of January.

Tomorrows low is predicting to be -10 degrees.