Lots of rain the last month but construction continues to move along. The structure so far consists of the elevator shaft and the portion designated as a force 3 tornado shelter which consists of the study hall and one religion classroom. The day after this video was completed a load of steal arrived and was unloaded so expect some major progress coming soon.