Showing posts with label Video. Show all posts
Showing posts with label Video. Show all posts

Wednesday, November 15, 2017

Building nears completion: KETV 5pm Newscast


Omaha's KETV recently featured our new building on their 5:00 pm newscast.

Friday, May 12, 2017

Monday, February 27, 2017

Mid January - Mid February Time Lapse Construction




Also Watch the entire construction Time-Lapse since May 2016.  Duration 7:17 

Friday, January 20, 2017

Mid December thru Mid January Time Lapse Video


The weather has been good for January.  We did have some very icy days but generally not to bad.  The most visible change has been the adding of precast stone along the roof line.  The one-story portion of the building has yet to begin.

Friday, December 16, 2016

Mid November thru Mid December Time Lapse



The second floor has been poured and the framing of the 2nd floor exterior wall is progressing. Steel for the south wing is on site.  Construction is running behind about one month so the hope is the building will be totally enclosed by the end of January.

Tomorrows low is predicting to be -10 degrees.

Monday, November 21, 2016

Mid October thru Mid November Time Lapse Video


Much of the steel frame is now completed for the two story portion of the building.  They will soon pour the the 2nd floor.

Monday, October 17, 2016

Construction Video September 16-October 15


It a was better month weather-wise for construction.  The day after September's Fall Festival, the first load of steel arrived. Besides steel for the two story portion of the building, cement slabs were set in place on the cinder block tornado shelter.

Construction is currently about a month behind schedule because of all the rain we had this summer.  Hopefully mother nature cooperates the next couple of months so that the building can be enclosed before a predicted wet winter with a delayed spring gets underway.


Wednesday, September 21, 2016

Time Lapse 30 Days of Construction




Lots of rain the last month but construction continues to move along. The structure so far consists of the elevator shaft and the portion designated as a force 3 tornado shelter which consists of  the study hall and one religion classroom. The day after this video was completed a load of steal arrived and was unloaded so expect some major progress coming soon.

Monday, August 29, 2016

Time Lapse Construction Video #2



Video #2
July 8, 2016 -August 15, 2016

Thursday, July 28, 2016

Excavation: Time Lapse

May 18, 2016 - July 8, 2016